[1]
Saad Farhan Ibrahim Alabdullah, Ali Jabbar Kadhim and Harith Basim Khalaf 2020. LIFE CYCLE COST ANALYSIS FOR REINFORCED GEOGRID RAILWAY TRACK. GEOMATE Journal. 19, 75 (Nov. 2020), 191–196.