Do Ngoc, T., Van, K. D. ., Van, V. P. and Van, Q. N. . (2022) “PREDICTION OF SURFACE SETTLEMENT DUE TO TWIN TUNNEL CONSTRUCTION IN SOFT GROUND OF HANOI METRO LINE 03”, GEOMATE Journal, 22(94), pp. 66–72. Available at: https://geomatejournal.com/geomate/article/view/3209 (Accessed: 28 March 2024).